Ordinance Covering Large Scale Computing and Data Centers

AN ORDINANCE AMENDING CHAPTER 156 ZONING CODE, SECTION 156-080 (C-3
GENERAL AND HIGHWAY SERVICING DISTRICT) AND SECTION 156-230
(AMENDMENTS); ADDING SECTIONS 156-125 THROUGH SECTION 156-129 RELATED
TO LARGE-SCALE COMPUTING AND DATA PROCESSING FACILITIES

WHEREAS, the City of Raton, New Mexico (the “City”) is authorized under Section 3-
21-1 NMSA 1978 and its general police powers to adopt zoning regulations that promote the
health, safety, and general welfare of its residents; and

WHEREAS, large-scale computing and data processing facilities exceeding two (2)
megawatts of connected electrical demand are a distinct land use because of their
extraordinary electrical and water consumption, cooling needs, building scale, and noise
and emergency-response characteristics; and

WHEREAS,the Zoning Code does not currently define or regulate these facilities, and
the City finds that clear standards for their location, design, operation, and
decommissioning are needed to protect residential neighborhoods, municipal utilities, and
the City’s water supply; and

WHEREAS, the City finds that such facilities are inconsistent with the purpose of the
C-3 General and Highway Servicing District and should be prohibited there, that small
facilities may be appropriately sited in the L-I Light Industrial and C-4 Rural Commercial
Districts, and that medium and large facilities should be sited only in the H-I Heavy Industrial
District, in each case by special exception following public hearing; and

WHEREAS, the City finds that Section 156-230 should be amended to require
rezoning applicants to demonstrate consistency with the Comprehensive Plan and
adequate infrastructure and compatibility, and that adoption of these regulations creates
no presumption that any property will be rezoned to accommodate such a facility; and

WHEREAS, the City Commission has determined that these amendments are
consistent with the City’s Comprehensive Plan and in the best interest of the health, safety,
and general welfare of the City’s residents.

NOW, THEREFORE, BE IT ORDAINED by the City Commission of the City of Raton,
New Mexico, as follows:
1. The following amendments to Chapter 156 City of Raton Zoning Code, Section
156-080 (C-3 General and Highway Servicing District);
2. Section 156-230 (Amendments);

3. Adding Section 156-125 through Section156-129 Related to Large Scale
Computing and Data Processing Facilities; therefore;
§ 156.080 C-3 GENERAL AND HIGHWAY SERVICING DISTRICT.
(A) This district is designed for the major roads leading in and out of Raton. The primary
purpose of the district is to provide for retailing of goods and services to passing motorists and
local residences. Since the commercial areas in this district are subject to public view, which is a
matter of important concern to the whole city, provisions should be made to provide for an
attractive appearance.
(B) (1) Permitted uses and structures.
(a) Any commercial use except those specifically prohibited. Prohibited uses are:
1. Those uses permitted under the heavy industrial districts;
2. Animal hospitals, veterinary clinics, animal shelters, and kennels whereas the
animals are kept outside of the building;
3. Display, storage, or sale of material from scrap or salvage operations;
4. Automobile wrecking, storage of wrecked automobiles, salvage operations and
similar types of uses; and
5. Large-scale computing and data processing facilities.
(b) Living quarters (apartments) on the second stories and above in commercial
buildings.
(Am. Ord. 899, passed 2-22-2000)
§ 156.230 AMENDMENTS.
(A) A change to a zoning district, (rezoning), shall be considered as a change to the zoning
map and not a change to this chapter. Rezoning shall be effective only by resolution of the City
Commission after the public hearing and public notice as hereinafter provided. Any applicant
seeking a change to a zoning district, a rezone or a specific designation to an otherwise
undesignated zone shall be required to demonstrate consistency with the then current
Comprehensive Plan, compatibility with surrounding zoning, and as necessary, any existing
transportation availability and traffic capacity, water and wastewater capacity, electrical
infrastructure, adequate fire and emergency response, identify and moderate as necessary any
noise and environmental impacts, compatibility with nearby residences and the availability of
appropriately zoned industrial land if an industrial use is sought.
(Am. Ord. 878, passed 1-27-1998)

(B) In amending the number, shape, boundary, or area of any district, or any regulations
pertaining to any district, or any section of this chapter, the procedure shall be as follows.
(1981 Code, App. A) (Ord. 624, Art. XVI, § 1, passed 2-25-1975)

REGULATIONS GOVERNING LARGE-SCALE COMPUTING AND DATA-PROCESSING

FACILITIES

§ 156.125 PURPOSE.
(A) The intent and purpose of regulating large-scale computing and data processing facilities
is to protect the health, safety, and general welfare of the residents of the City while
ensuring that these facilities are situated in a predictable and compatible manner with
existing and planned development consistent with the City’s Comprehensive Plan and not
located in areas where they may conflict with the character of the City’s residential
neighborhoods and special places and ensure compatibility with surrounding areas and
community goals.
(B) Large scale computing and data processing facilities exceeding two (2) MW of connected
electrical demand constitute a distinct land-use category because of their extraordinary
utility consumption and cooling needs, building scale and mechanical, noise, and
emergency-response characteristics.
(C) The following regulations are intended to protect the character of residential areas of the
community, ensure compatibility with existing light and heavy industrial zones and
maintain the operation of relatively clean and generally unobtrusive industrial uses that
are not considered obnoxious to adjacent land uses.
(D) Adoption of these regulations does not establish a presumption that property currently
zoned residential, commercial, or mixed-use should or could be rezoned to an industrial
district to accommodate a large-scale computing or data-processing facility.

§ 156.126 DEFINITIONS.
(A) Definitions. For the purpose of this chapter, the following definitions shall apply unless the
context clearly indicates or requires a different meaning.
LARGE SCALE COMPUTING AND DATA PROCESSING FACILITY (or “FACILITY”).
A facility, building, structure, engineered modular unit, or mobile/temporary unit where a
substantial portion of the space or power capacity is used to store, manage, process, or transmit
electronic, optical, quantum, or digital data. This includes, but is not limited to, housing computer
and network equipment, systems, servers, appliances, and other related components.

For the purposes of this zoning code, a facility is considered a Data Processing Facility if the
computing equipment and associated cooling/support systems require a total connected electrical
load of two (2) Megawatts (MW) or greater, regardless of whether the computing operations are
classified as a primary or accessory use.

LARGE FACILITY. A facility consuming more than 20 megawatts (MW) of power.
MEDIUM FACILITY. A facility consuming between ten (10) and twenty (20) mega-watts (MW)
of power.
SMALL FACILITY. A facility consuming between two (2) megawatt (MW) to ten (10)
megawatts (MW) of power.
BOARD OF ADJUSTMENT. Consistent with Sections 156.210 through 156.216, the Planning
and Zoning Commission of Raton, New Mexico, shall act as the Zoning Board of Adjustment. The
word “Board,” when used in this chapter, shall be construed to mean the Zoning Board of
Adjustment and the processes described in Sections 156.210 through 156.216 shall apply to
these regulations applicable to large-scale computing and data processing facilities.
§ 156.127 DATA CENTER LAND USE CLASSIFICATIONS, SUPPLEMENTAL STANDARDS
AND SPECIAL EXCEPTION PROCEDURE.
(A) A large-scale computing and data processing facility may be located only within
designated zoning districts as specified in this code.
(B) Special exception eligibility for such facilities shall be limited to the following:
(1) A small facility shall be allowed within an L-I Light Industrial District or C-4 Rural
Commercial District provided:
a. All buildings and associated equipment are at least 1320 feet (one-quarter
mile) from any lot zoned R-HZ, R-1, R-4, R-5, RM-1, RMS, MHP, or R-O-I; or
are within an H-I Heavy Industrial District.

(2) A medium or a large facility shall be allowed only within the H-I Heavy Industrial
District.
(C) Special exception application submittals.
(1) As outlined in § 156.213(B), the Board of Adjustment shall conduct a public hearing to
determine if a facility may be permitted under a special exception and that the use is not
offensive or incompatible in keeping with the character of the respective zone district.

(2) Applicants seeking special exception approval for a facility shall provide the following to the
Board of Adjustment for consideration:
a. Sufficient copies of a proposed development plan, drawn at a scale no greater than
100 feet to the inch that shows:
i. North arrow;
ii. Boundaries of the property to be developed;
iii. Dimensions and arrangement of all proposed and existing buildings and
structures on the site, including sufficient screening to be provided for rooftop
and ground-mounted mechanical equipment, cooling towers, and generators
to conceal all equipment from public view through the use of architectural
features;
iv. Required and provided off-street parking spaces and loading areas, internal
circulation routes, ingress and egress from adjoining streets, service areas and
facilities;
v. Adequate fire access, lanes and emergency vehicle parking areas;
vi. Conceptual grading and drainage plan when considered appropriate by the
Raton Public Works Department;
vii. Existing and proposed public and private streets, alleys and easements, with
proper names and dimensions;
viii. Size, location, orientation and type of all signs proposed; and
ix. Location, height, and orientation of all proposed lighting for the premises.
Unless required by state or federal law, all exterior lighting shall be fully
shielded and directed downward to prevent light from crossing over to adjacent
properties and/or the public right-of-way.

b. Written availability statement from, or individualized contract to be negotiated with, the
Raton Public Service (RPS) Company if the site will be using a public grid connection.
Such statement or contract shall specify the requested power and how RPS plans to
deliver it. The individualized contract(s) shall account for the costs of generation,
transmission, and other infrastructure costs related to facility operations.
c. Written availability statement from Raton Water Works (RWW) based on a proposed
water reclamation and water reuse plan that specifies:
i. Water needs of the project defined as the total amount of water consumed
annually by the project for cooling, on-site power generation, landscaping,
general plumbing, and any other uses.

ii. Water needs shall be estimated by the developer initially, and annual reporting
of actual water consumed shall be required.
iii. Clarification about the process and associated details deemed necessary by
RWW regarding how the facility will purify wastewater. All waste and
wastewater disposal shall be in compliance with EPA and NMED standards.
iv. Cooling shall be accomplished via a closed loop, recapture, or refrigeration; no
evaporative system shall be permitted.

d. Written statement from the developer that generator use and testing shall be limited to
daytime hours between 8:00 am and 6:00 pm, except in emergency power outage
situations.
e. Written noise study completed by a licensed professional engineer, specializing in
acoustics or an engineer Board Certified by the Institute of Noise Control Engineers,
demonstrating that the operation of the facility will comply with the following standards:
i. Continuous noise from mechanical equipment, including cooling systems and
generators, shall not exceed 75 dB(A) and 90 dB(Z) at the property line
between the hours of 7:00 am to 9:00 pm and 65 dB(A) and 80dB(z) between
the hours of 9:01 pm to 6:59 am at the property line, measured in accordance
with American National Standards Institute (ANSI) guidelines.

f. The study shall use best practices and predictive acoustical modeling, including,
among other factors, sound source location and directivity, and barrier effects of
buildings and topography and shall include all proposed development on a lot or site
plan. If the development will be completed in phases, the study must address both the
proposed phase and the ultimate buildout at full occupancy of the proposed
development.
g. Written decommissioning plan prepared by a qualified professional.
i. The plan shall outline the procedures for safe shutdown and removal of all
hazardous equipment from the site.
ii. The plan shall acknowledge that:
1. Decommissioning work shall begin within 12 months of cessation of
facility operations, or upon notice of abandonment by the operator,
whichever occurs first. An extension of 12 months may be granted by
the Board of Adjustment if the property owner can demonstrate that
they are actively marketing the site for a compatible replacement use.

Decommissioning shall be completed within 18 months thereafter,
unless extended by the municipality for good cause.
2. All Hazardous materials, including batteries, fuel, or refrigerants, shall
be removed and disposed of in compliance with state and federal law.
3. Any utility connections shall be safely disconnected and capped.
(D) Address emergency generators, fuel storage, hazardous material storage, screening and
fencing, building height, exterior lighting and equipment yard. Any applicant may be
required to enter into an infrastructure commitment and conditions agreement for the
construction or dedication of infrastructure connected to the developments and facilities
impacts to the City and community.
(E) Procedure.
(1) The Board of Adjustment shall make its decision on each proposed special exception
for a facility, and in the event of approval shall impose minimum development
requirements as required by this chapter. Unless approval specifies to the contrary,
the special exception so granted will continue for the life of the use.
a. Pursuant to § 156.214, the City Commission shall hear and decide any appeal
of a final decision made by the Board of Adjustment.

(2) No building or occupancy permits shall be issued for any building or structure that is
not in accordance with the development plan approved associated with the special
exception. Proposed changes, modifications, or differences to the approved
development plan shall require consideration of the Board of Adjustment during a
public hearing as outlined in § 156.213(B).
(3) Within ninety (90) days of occupancy, a post-construction noise study completed by a
licensed professional engineer, specializing in acoustics or an engineer Board
Certified by the Institute of Noise Control Engineers, must be submitted to the Planning
and Zoning Department, including field measurements of all installed equipment to
confirm that the built condition at full operational load meets the Noise Ordinance. If
future equipment is planned to be installed in the building, the field measurements
shall be used to calibrate the model, and an analysis should be completed to include
the existing and planned equipment.

i. If the initial noise study fails to meet the standards outlined in Section
156.127(C)(2)(f)(i), the Facility shall have ninety (90) days to correct
any deficiencies and submit a revised noise study demonstrating full
compliance. If this deadline is not met, the City, Raton Water Works,

and Raton Power Services reserve the right to the following actions:
Revoke business license and/or certificate of occupancy
ii. Cease utility services

(4) Any requirement imposed by the Board of Adjustment shall become effective and shall
be strictly complied with immediately upon execution of utilization of any portion of the
rights and privileges authorized by approval of the special exception.

§ 156.128 PENALTIES.
Any violation of this ordinance shall be subject to penalties as provided in the City Code, including
suspension or revocation of business license, fines, and/or legal action.
§ 156.129 SEVERABILITY.
If any section, subsection, sentence, clause, phrase, term, provision, condition, or portion of this
ordinance is for any reason held invalid, unenforceable or unconstitutional by a court of
competent jurisdiction, such portion shall be deemed a separate, distinct and independent
provision, and such holding shall not affect the validity or enforceability of the remaining portions
of this ordinance.

This ordinance shall become effective thirty (30) days publication as provided by NMSA 1978,
§3-17-5, or as otherwise provided by the Raton City Charter and applicable law.
PASSED, ADOPTED, AND APPROVED this day of , 2026.

Lori Chatterley, Mayor

ATTEST:

Desire’e Trujillo, City Clerk