{"id":78230,"date":"2022-05-24T17:11:42","date_gmt":"2022-05-24T23:11:42","guid":{"rendered":"http:\/\/krtnradio.com\/?p=78230"},"modified":"2022-05-24T17:11:42","modified_gmt":"2022-05-24T23:11:42","slug":"i-25-public-involvement-meeting-for-raton-exit-451-interchange","status":"publish","type":"post","link":"https:\/\/krtnradio.com\/wp\/2022\/05\/24\/i-25-public-involvement-meeting-for-raton-exit-451-interchange\/","title":{"rendered":"I-25 Public Involvement Meeting for Raton Exit 451 Interchange"},"content":{"rendered":"<p align=\"center\">PUBLIC INVOLVEMENT MEETING<\/p>\n<p align=\"center\">for the\u00a0I-25 Raton\/Clayton Interchange\u00a0(NMDOT Control Number: 4101690)<\/p>\n<p align=\"center\"><span id=\"OBJ_PREFIX_DWT165_com_zimbra_date\" class=\"Object\" role=\"link\">Wednesday, May 25<\/span>, 2022<\/p>\n<p align=\"center\">6:00 to 7:30 PM<\/p>\n<p align=\"center\">NMDOT is conducting a\u00a0virtual public meeting\u00a0to collect input on the I-25 Raton\/Clayton Interchange study, which evaluates transportation needs to enhance connectivity in Raton. The\u00a0purpose of the meeting\u00a0is to present the proposed interchange alternatives developed for consideration and obtain input from the public on those alternatives, along with any other concerns within the study area.<\/p>\n<p align=\"center\">The study area includes the US 64\/87 interchange on I-25 from MP 450.84 to MP 452.35. The Raton\/Clayton Interchange serves as one of three access points to the City of Raton, and also connects to the US 64\/87 highway corridor. This highway provides access to communities in northwest New Mexico as well as regional connectivity for the nation\u2019s transportation system.<\/p>\n<p align=\"center\">To request technical support or Americans with Disabilities Act (ADA)-related accommodations for the meeting, email\u00a0<span id=\"OBJ_PREFIX_DWT166_ZmEmailObjectHandler\" class=\"Object\" role=\"link\">RatonClaytonInterchange@bhinc.com<\/span>\u00a0at least two days before the meeting. Para obtener m\u00e1s informaci\u00f3n, env\u00ede un correo electr\u00f3nico a\u00a0<span id=\"OBJ_PREFIX_DWT167_ZmEmailObjectHandler\" class=\"Object\" role=\"link\">RatonClaytonInterchange@bhinc.com.<\/span>\u00a0Comments will be accepted during the public involvement meeting or can be emailed to\u00a0<span id=\"OBJ_PREFIX_DWT168_ZmEmailObjectHandler\" class=\"Object\" role=\"link\">RatonClaytonInterchange@bhinc.com<\/span>, or mailed to\u00a0Raton Interchange Project, Bohannan Huston Inc, 7500 Jefferson St. NE, Albuquerque, NM 87109.\u00a0Comments and questions will be accepted up to 30 days after the public involvement meeting.<\/p>\n<p align=\"center\">For more information, go to the project website at:\u00a0<span id=\"OBJ_PREFIX_DWT169_com_zimbra_url\" class=\"Object\" role=\"link\"><a href=\"https:\/\/r20.rs6.net\/tn.jsp?f=001HaOqy8OOW3sGxav_IF71GQngvF4uv7Jc8zddCwlVERQuIae7gU-VEtcuF7tI7DAfth0iHZnW06FdG3VDHNnYyhjTO4RohRGo39xjvBYXbcDuYAgBfNHCMgqum10QGmJRUmoKqWIxx7g-ELGISR0Xsua6o3tTrbL4S_ihSh0Fk8T5yabsUGjSt2nb9DWqOr-n&amp;c=g5mHzV6qMO6WNvMSiJzBJ3R9BhWxmeiburFhwM7TFw8NIkr2OaNJBA==&amp;ch=d4k6B88sRxKcV4fcbwf_OsctolTTVVo-2yI4FMxJNkPBxEmtRNmc4w==\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">bhi.mysocialpinpoint.com\/raton-clayton-interchange<\/a><\/span><\/p>\n<p align=\"center\">Use the following link to register for the meeting:\u00a0<span id=\"OBJ_PREFIX_DWT170_com_zimbra_url\" class=\"Object\" role=\"link\"><a href=\"https:\/\/r20.rs6.net\/tn.jsp?f=001HaOqy8OOW3sGxav_IF71GQngvF4uv7Jc8zddCwlVERQuIae7gU-VEtcuF7tI7DAfKORmKNv3XyVlkNMUDobfseh8MK2zKRhWTMW8poJkbGbIMmQ3OSPjB0JK4gQwm1h7wewe1P_IWMxSmY1LhcNJJz9ZLl-pri8lf57TBsxi-OO2OcxTx3IusYCeaZBzbUyBUcjI6Qa7cHg=&amp;c=g5mHzV6qMO6WNvMSiJzBJ3R9BhWxmeiburFhwM7TFw8NIkr2OaNJBA==&amp;ch=d4k6B88sRxKcV4fcbwf_OsctolTTVVo-2yI4FMxJNkPBxEmtRNmc4w==\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">project.bhinc.com\/ RatonClaytonInterchangePublicMeeting<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PUBLIC INVOLVEMENT MEETING for the\u00a0I-25 Raton\/Clayton Interchange\u00a0(NMDOT Control Number: 4101690) Wednesday, May 25, 2022 6:00 to 7:30 PM NMDOT is conducting a\u00a0virtual public meeting\u00a0to collect input on the I-25 Raton\/Clayton Interchange study, which evaluates transportation needs to enhance connectivity in Raton. The\u00a0purpose of the meeting\u00a0is to present the proposed interchange&#8230;<\/p>\n","protected":false},"author":5,"featured_media":78231,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-78230","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","entry","rows-excerpt"],"_links":{"self":[{"href":"https:\/\/krtnradio.com\/wp\/wp-json\/wp\/v2\/posts\/78230","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/krtnradio.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krtnradio.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krtnradio.com\/wp\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/krtnradio.com\/wp\/wp-json\/wp\/v2\/comments?post=78230"}],"version-history":[{"count":1,"href":"https:\/\/krtnradio.com\/wp\/wp-json\/wp\/v2\/posts\/78230\/revisions"}],"predecessor-version":[{"id":78232,"href":"https:\/\/krtnradio.com\/wp\/wp-json\/wp\/v2\/posts\/78230\/revisions\/78232"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/krtnradio.com\/wp\/wp-json\/wp\/v2\/media\/78231"}],"wp:attachment":[{"href":"https:\/\/krtnradio.com\/wp\/wp-json\/wp\/v2\/media?parent=78230"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krtnradio.com\/wp\/wp-json\/wp\/v2\/categories?post=78230"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krtnradio.com\/wp\/wp-json\/wp\/v2\/tags?post=78230"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}